Altay Region

STRATEGIC TASKS THE REGION DEVELOPMENT

The development scenario of the Altay Region is implemented within the framework of the scenario of accelerated growth of the country and implies increased economic growth rates based on a more intensive inflow of investments and the most favorable conditions on world food markets. A high growth rate will be achieved due to intensive renovation of the production base in such sectors as engineering, construction, real estate operations, services, including tourism. It is planned to increase the volume of industrial production by 2.5 times.

DEVELOPMENT PLANS FOR THE POWER COMPLEX

In the period up to 2025, in the Altay Region, about 13 investment projects of power grid construction will be implemented to optimize and improve the power supply schemes of large cities and towns. Special attention will be paid to the development of inter-system electrical connections, guaranteeing the reliability of the exchange of electrical energy and power between the Altay Region and the neighboring regions of Russia: Novosibirsk and Kemerovo Regions, Krasnoyarsk Region, and the Republic of Kazakhstan. The implementation of investment projects in the field of energy will increase the installed capacity of power plants by 1.6 times to 2,783.7 MW. This will allow eliminating the shortage of electricity in the Altay Region already by 2020 and will ensure reliable development of the economy. By 2025, the per capita consumption of electricity is expected to increase by 1.2 times while reducing the level of electrical consumption of GRP by 2.5 times.

In the framework of the implementation of pilots project “Digital PDZ” planned to complete in 2020 building of the Mayminsky Distribution Zone and launching of the pilot zone of distribution grids from 110/10 kW Substation Mayminskaya (Gorno-Altai Electric Grids).

4,900 kW

THE LARGEST INDUSTRIAL COMPLEX CONNECTED IN 2018 — LLC PAVLOVSKIY DOK; PAVLOVSKY DISTRICT

In the framework of the implementation of pilots project “Digital PDZ” planned to complete in 2020 building of the Mayminsky Distribution Zone and launching of the pilot zone of distribution grids from 110/10 kW Substation Mayminskaya (Gorno-Altai Electric Grids).

The partnership between the Altay Region and IDGC of Siberia has lasted for more than 10 years. Recent years have been characterized by an active, constructive dialogue and joint effective actions aimed at both uninterrupted power supply to consumers and the development of the region as a whole. Reconstruction and modernization of equipment, construction of new facilities, stable operation of the power grid complex in the autumn-winter period — all this ensures the stable operation of all industries.
Viktor Tomenko Altay Region Governor