Regions

With good
energy

WE CREATE OPPORTUNITIES

FOR BETTER LIFE CONDITIONS IN THE REGIONS OF PRESENCE

REPUBLIC
OF ALTAY

TECHNOLOGICAL
CONNECTION OF THE
ATLANT ICE PALACE IN 
THE REPUBLIC OF ALTAY

The palace is being built at the expense of the federal budget at the direction of the president of the Russian Federation V. V. Putin. Construction is scheduled to be completed by mid-May 2019. The actual technological connection was completed on 12/13/2018.

Republic of
Buryatia

THE IDGC
OF SIBERIA-
BURYATENERGO
REPAIR PROGRAM

In 2018, the IDGC of Siberia-Buryatenergo repair program amounted to 420 million rubles, and the investment program — 954 million rubles. The funds were used for the repair of overhead lines, substations, reconstruction of transformer substations and replacement of supports. There were also implemented measures for technological connection of consumers and modernization of retail electricity market metering systems.

Republic
of Khakassia

KHAKASENERGO
CONNECTED
MAYRYKHSKY COAL
CUT TO THE POWER
GRIDS

To the object provided 3,000 kWt of the powercapacity, it is enough for normal work and subsequent development of coal-mining enterprise. 110/35 kW Rajkovo substation became the power supply for Mayrykhsky coal cut. Subsidiary specialists conducted in due time all necessary technological events on connection to the electric systems. For power capacities reception coal company constructed a modern substation of voltage 35 kW and maximum capacity no less than 8,900 kWt. Managing Company of Mayrykhsky coal cut expected to extract 1 million tons of coal in year.

Altay Region

THE LARGEST
INDUSTRIAL COMPLEX
CONNECTED IN 2018 —
LLC PAVLOVSKIY DOK;
PAVLOVSKY DISTRICT

4,900 kW

In the framework of the implementation of pilots project “Digital PDZ” planned to complete in 2020 building of the Mayminsky Distribution Zone and launching of the pilot zone of distribution grids from 110/10 kW Substation Mayminskaya (Gorno-Altai Electric Grids).

ZABAIKALYE REGION

CONNECTION
TO THE POWER GRIDS
OF THE BRANCH
OF IDGC OF JSC.

In 2018 in the Zabaikalye Region, the following were connected to the power grids of the branch of IDGC of JSC:

  • the power grid complex of the Steppe airfield is applicant of OBORONENERGO JSC, with a capacity of 7.868 MW;
  • object for the construction of an enterprise for the extraction and processing of oxidized ores of the Delmachik gold ore deposit the applicant Ltd. ZOLOTO DELMACHIK, with a capacity of 4.9 MW;
  • apartment buildings in Chita applicants: OOO MIR, OOO PGS, JSC RUS, ZAO Zheldoripoteka, LLC IC Energozhilstroy with a total capacity of 1.434 MW.
KEMEROVO
REGION

CENTRALIZE
POWER SUPPLY
IN THE REGION

For the first time in 15 years, another remote settlement of the Tashtagol District of the Kemerovo Region was transferred to centralized power supply. This correlates with the direction of the Strategy (creation of a tourist and recreational cluster Mountain Shoria). In the village of Ust-Kabyrz, the power engineers put into operation new distribution grids as part of an investment project to improve the reliability of electricity supply in the village of Ust-Kabyrs and transfer the village of Parlagol to centralized power supply. In Kuzbass, a network of filling stations for electric vehicles was created in 2018.

KRASNOYARSK REGION

TECHNOLOGICAL
CONNECTION
OF UNIVERSIADE
2019 FACILITIES
(KRASNOYARSK)

In preparation for the Universiade-2019 IDGC of Siberia provided technological connection to 13 Universiade facilities, including seven sports facilities (Yenisei Stadium, Arena Sever Stadium, Biathlon Academy, etc.) and six socially significant facilities (Regional Clinical Hospital, Regional emergency hospital, campus “Feathers”, etc.)

OMSK REGION

CONSTRUCTION
OF THE ENERGY
INFRASTRUCTURE
FOR THE AVANGARD
HOCKEY ACADEMY
UNDER CONSTRUCTION

On the territory of the central complex of the academy there will be several large sources of energy consumption: the Ice Palace with two ice rinks, hotels for non-resident pupils, a medical center, sports halls, a press center, training classes, a rehabilitation center, a canteen.

TRANSMISSION OF 
POPULATION TO THE
ELECTRIC HEATING

Transmission of population to the electric heating in the Azov, Bolsherechensky, Znamensky, Krutinkom, Novovarshavsky, Okoneshnikovsky, Pavlograd, Ekaterininsky, Tarsky, Ust-Ishimsky, Cherlaksky, Tarsky, Gorky districts. This made it possible to decommission emergency and unprofitable boiler houses operating on fuel oil and to provide heat in Omsk houses, regardless of the fuel supply.