Technological connections to electricity grids
Name of the type connection | Number of submitted applications to yransformer substantion | Contracts concluded | Contracts executed (actual connection performed) | |||
---|---|---|---|---|---|---|
pcs | kW | pcs | kW | pcs | kW | |
Up to 15 kW total | 35,727 | 448,240 | 30,349 | 383,204 | 27,738 | 345,449 |
Including physical entity | 32,097 | 415,357 | 27,771 | 360,377 | 25,234 | 324,227 |
From 15 to 150 kW, total | 2,999 | 207,017 | 2,123 | 145,849 | 1,460 | 90,933 |
From 150 to 670 kW, total | 705 | 252,546 | 292 | 104,491 | 320 | 109,139 |
More than 670 kW | 338 | 1,423,182 | 94 | 278,865 | 105 | 294,916 |
Electric capacity generation facilityies | 14 | 181,983 | 4 | 52,400 | 1 | 5,000 |
IDGC of Siberia | 39,783 | 2,512,968 | 32,862 | 964,809 | 29,624 | 845,438 |
The number of applications to PJSC IDGC of Siberia increased by 7% in 2018. At the same time, the total scope of the maximum capacity of applications submitted is higher than in 2017 by 25% or by 509.17 MW.
The main increase was revealed in the category of applications with a capacity of up to 15 kW (an increase in the amount by 4.6%, increase in the maximum capacity by 4.9%) and in the category of applications with a category with a capacity over 15 kW and up to 150 kW (an increase in the amount by 43%, an increase in the maximum by 41%). The number of contracts concluded in 2018 increased by 12% or 3,449 units, the total capacity of the concluded contracts increased by 8% or 68.13 MW compared to 2017.
The reason for the increase in the number of applications filed and contracts concluded is mainly a change of federal legislation due to the expansion at the legislative level of the category of preferential technological connection (up to 150 kW).
29,624 contracts for technological connection of capacity receiving devices with a total capacity of 845.44 MW were actually executed in 2018. Including electrical installations of the preferential category of applicants up to 15 kW are 27,738 units and 345.45 MW, respectively. Completed contracts (performed connection to the electrical grid) is 1% or 248 units more than in 2017. The total capacity of the connected electrical installations slightly decreased compared to the figure for 2017 by 2.5 MW due to the predominance of the category of small and medium businesses among applicants.
In general, the planned values were exceeded by 24.1% in terms of the number of contracts in 2018, in terms of maximum capacity, the shortfall was 14.13%, due to the termination of a number of large contracts with a total capacity of 72 MW, as well as an extension of the execution period for the next periods under contracts with a total capacity of 67 MW.
For the up to 15 kW category of applicants, over-fulfillment of the planned targets was ensured: +21.5% by the number of contracts, +27.5% by the maximum capacity volume. These figures are due to the predominance in the total number of executed contracts for the implementation of technological connection of contracts belonging to the up to 15 kW category of applicants, as well as over 15 kW and up to 150 kW categories, i. e. categories of small and medium businesses. The direct growth in the number of executed contracts was due to the increased work on the elimination of overdue obligations under technological connection contracts in 2018.
Region | Number of submitted applications to yransformer substantion | Contracts concluded | Contracts executed (actual connection performed) | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| | | | | | ||||||||
,% | +/– | ,% | +/– | ,% | +/– | ,% | +/– | ,% | +/– | ,% | +/– | ||
PJSC IDGS of Siberia | 7 | 2,652 | 25 | 509,174 | 12 | 3,449 | 8 | 68,134 | 1 | 248 | –0.3 | –2,484 | |
Altay Region (Altayenergo) | –1 | –32 | –9 | –27,678 | –1 | –51 | –19 | –27,701 | –15 | –607 | 18 | 15,512 | |
Republic of Altay (Gorno-Altayskiye Capacity Grids) | 43 | 1,009 | –11 | –15,837 | 47 | 847 | 30 | 17,505 | 0 | 8 | 24 | 7,525 | |
Republic of Buryatia (Buryatenergo) | 1 | 37 | 81 | 124,368 | 0 | 1 | 7 | 4,884 | –6 | –183 | –11 | –6,864 | |
Krasnoyarsk Region (Krasnoyarskenergo) | 8 | 830 | 25 | 128,695 | 19 | 1,473 | 29 | 65,450 | 22 | 1,579 | 18 | 35,649 | |
Kemerovo Region (Kuzbassenergo – Regional Electric Grids) | 14 | 430 | 11 | 52,866 | 19 | 498 | –22 | –43,336 | 3 | 84 | 8 | 11,079 | |
Omsk Region (Omskenergo) | –7 | –320 | 116 | 188,075 | –6 | –227 | 22 | 16,951 | –2 | –69 | –47 | –103,879 | |
Republic of Khakassia (Khakasenergo) | 15 | 635 | 35 | 40,785 | 27 | 904 | 44 | 27,090 | –20 | –725 | –20 | –12,492 | |
Zabaikalye Region (Chitaenergo) | 2 | 63 | 15 | 17,900 | 0 | 4 | 12 | 7,291 | 7 | 161 | 115 | 50,986 |