Key events

A cooperation agreement was signed whereunder Rosseti represented by PJSC IDGC of Siberia took in trust the shares of Regional Electric Grids JSC and Electromagistral JSC (Novosibirsk region).

2

In Krasnoyarsk, the Company commissioned a 110 kW digital substation named after M.P. Smorgunova, built by PJSC IDGC of Siberia on the basis of the domestic software and hardware complex iSAS.

3

The branch of PJSC IDGC of Siberia — Khakasenergo received the functions of last resort electricity supplier in the territory of Republic of Khakassia.

4

PJSC IDGC of Siberia put into operation the largest power center in Yemelyanovsky district of Krasnoyarsk Region — Ozernaya 110 kW substation, built with all the latest technologies and requirements in the power industry. Investments amounted to more than 550 million rubles. The project was implemented in record time, in just 447 calendar days.

5

In preparation for the XXIX World Winter Universiade 2019, PJSC IDGC of Siberia put into operation the modern regional Grid Management Center of the Krasnoyarsk Region, the Universiade Energy Management Center and the Universiade Energy Facilities Management Center.

6

The Russian government approved allocation of funds for the creation of a digital power distribution zone (PDZ) and a new digital substation in the Republic of Tyva, in the administrative center of Kyzylskiy Kozhuun — the urban-type settlement Kaa-Khem in 2019. Kaa-Khemsky PDZ is one of 15 pilot projects of PJSC IDGC of Siberia (6 digital substations and 9 digital PDZs) that are in the design and implementation stages until 2030 with a total investment of more than 300 billion rubles.



1 January,
2019

Events after
the report date

On January 1, 2019 PJSC IDGC of Siberia accepted for servicing the electric grid complex of Ulan-Ude city: The Rosseti Group represented by the branch of PJSC IDGC of Siberia — Buryatenergo leased the property complex of Ulan-Ude Energo JSC as part of the program on сonsolidation of power grid assets. Buryatenergo provided employment for all employees of Ulan-Ude Energo JSC — about 400 people — while maintaining the level of wages and all social guarantees in accordance with the Collective Agreement of PJSC IDGC of Siberia.

2-12 March,
2019

On March 12, 2019 the XXIX World Winter Universiade was held in Krasnoyarsk. Power supply of 12 sports and 31 infrastructure objects of student games wascontrolled by the Universiade Energy Management Center of PJSC IDGC of Siberia. Reliability of power supply was guaranteed by 1130 power engineers, 749 of which were sent to Krasnoyarsk by employees of branches of PJSC IDGC of Siberia; 114 units of equipment were involved. For ten days, while the student games were going on, there was not a single technological violation at the power facilities supplying the Universiade sites.

20 March,
2019

On March 20, 2019 the shares of PJSC IDGC of Siberiaset a growth record over the past 5 years: the cost of one share amounted to 0.3155 rubles, which is almost 4 times more than the figure of 29.12.2018.

28 March,
2019

On March 28, 2019 the Board of Directors of PJSC IDGC of Siberia unanimously decided to elect Pavel Evilievich Akilin as the Director General of PJSC IDGC of Siberia with effect from March 29, 2019. Vitaly Valeryevich Ivanov was appointed General Director of IDGC of the North Caucasus, PJSC from the same date.