On March 12, 2019 the XXIX World Winter Universiade was held in Krasnoyarsk. Power supply of 12 sports and 31 infrastructure objects of student games wascontrolled by the Universiade Energy Management Center of PJSC IDGC of Siberia. Reliability of power supply was guaranteed by 1130 power engineers, 749 of which were sent to Krasnoyarsk by employees of branches of PJSC IDGC of Siberia; 114 units of equipment were involved. For ten days, while the student games were going on, there was not a single technological violation at the power facilities supplying the Universiade sites.